Print both pages or use your browser’s Print command to save a PDF. Fill in the blank tables by hand. Checkbox changes stay in this page only and are not saved to Workspace.
WashSage · Free printable worksheet · Page 1 of 2
Turnover laundry readiness
Plan backwards from ready beds, then record what actually happened. One copy per turnover.
1. Set the latest usable return
Enter full dates, local times and the time zone. The preparation deadline is when beds and towels must be ready. Allow time beforehand to inspect linen and prepare the setup. These are your planned durations, not fixed laundry standards.
D covers transport, waiting, washing, permitted drying and return to the property. Check service days and cutoffs; clock subtraction does not create a supplier collection. Keep final inspection / preparation in B, not twice in D. Confirm the schedule with the responsible person.
| Stage | Planned date / time | Confirmed with / actual date and time |
|---|---|---|
2. Collect, count and prepare the process
Read the turnover guide. Platform context: Airbnb’s between-guest cleaning guidance and blocked calendar nights. These do not set universal wash temperatures or durations.
WashSage · Turnover laundry · Page 2 of 2
3. Inspect and record actual readiness
Use matching type and size names. Record the required setup quantities. Expected returns stay separate from received, inspected clean items.
| Row | Item type and size | Required for setup | Received / inspected clean | Used in prepared setup | Protected clean reserve kept | Unresolved shortage |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 |
The protected reserve is separate from the guest setup. A clean receipt does not prove beds are made. If a required count is unknown, readiness remains unconfirmed. A late return cannot resolve a shortage before the preparation deadline.
4. Resolve or escalate every gap
| Row | Item / size and missing quantity | Confirmed alternative or action | Owner | Deadline / outcome |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 |
Readiness decision — choose one
An expected delivery, started dryer or scheduled task is not a readiness sign-off. This paper worksheet does not automatically update bookings or stock.
Follow-up: recount inventory · Linen Forecast · all linen management guides. Use actual product labels and exact appliance instructions.